
Product Details


Zilla Double Stud XL hardware
Zilla Double Stud XL hardware
SKU: ZIL-9901
Regular price
$5.29 CAD
Regular price
Sale price
$5.29 CAD
Unit price
/
per
Couldn't load pickup availability
Product Documents
Downloads
Technical Details
Manufacturer Part Number:
ZDS-G component
Zilla Double Stud XL hardware ZDS-G Hardware ONLY for ZDSFA-XL, sold by individual piece
Zilla Double Stud XL Flashing Assembly attaches directly to sheathing and features patented design innovations that provide a simple, safe, and secure way to install solar PV systems on composition shingle rooftops.
Features
Attaches to decking or structure.
Uses industry-leading installation method of attachment first, flashing second.
Sleek, low profile design provides three layers of patented waterproof protection.
Passed 3rd party testing for roof flashings in accordance with AC 286 evaluation standards using the methodology of UL 441.
No shingle cutting or caulking.
Compatible with all leading racking systems.
25-year warranty.
Benefits
Eliminates need to locate rafters.
Eliminates need to drill pilot holes and backfill.
Eliminates need for sealants.
Eliminates rafter splits.
Attaches to decking or structure.
Maintains integrity of the structure during expansion and contraction.
Install arrays where you want them.
Reduces training and time spent on the roof.
Zilla Double Stud XL Flashing Assembly attaches directly to sheathing and features patented design innovations that provide a simple, safe, and secure way to install solar PV systems on composition shingle rooftops.
Features
Attaches to decking or structure.
Uses industry-leading installation method of attachment first, flashing second.
Sleek, low profile design provides three layers of patented waterproof protection.
Passed 3rd party testing for roof flashings in accordance with AC 286 evaluation standards using the methodology of UL 441.
No shingle cutting or caulking.
Compatible with all leading racking systems.
25-year warranty.
Benefits
Eliminates need to locate rafters.
Eliminates need to drill pilot holes and backfill.
Eliminates need for sealants.
Eliminates rafter splits.
Attaches to decking or structure.
Maintains integrity of the structure during expansion and contraction.
Install arrays where you want them.
Reduces training and time spent on the roof.
